Sunday 29 September 2013

Coastal Boats Update

The single shown above is now upside down and having the hull faired, the chines filled and rounded. Over the next couple of weeks both boats need to be completed, ready to be trailered over to Switzerland. There is still plenty of sanding to be done. The ply needs sealing with several coats of Eposeal, priming and painting.  Then all the fittings should be here and can be fitted.  

The Coastal 4 with the riggers being bonded into place

The unusual bow section on the 4 

The riggers prior to being sheathed